“Design Team”
Collaboration Projects
|
Company |
Project |
Equipment |
|
MJW
Construction, Inc. 26900 Winchester Creek Ave Murrieta, Contact: Rich Cashman Office: 818•888•1036 Cell: 818•266•5288 |
Construct
245L.F. wall
of Sheet pile on flood control line. Design
and fabricate channel top for a concrete
slab |
Crane Vibratory Hammer Welding Truck |
|
Highland
Engineering, Inc. 65
Contact:
Rich Thompson Office: 949•330•6411 Cell: 949•525•5677 |
Install
21 jacking and receiving pits for micro tunneling. Drive sheet pile, weld and
fabricate whaler systems de-water pits Inspectors:
|
2 Cranes Vibratory Hammer Drill Rig Welding Truck |
|
Affholder Inc. Contact:
John Wallace Office:
805•815•3184 Cell: 818•968•1625 |
Install
500L.F. sheet pile wall for micro tunneling system. Design & fabricate steel whaler
system. De-water and pour concrete trim seal. Inspectors:
|
Crane Vibratory Hammer |
|
Mialden Buntich 1500
Contact:
Junior Buntich Office: 909•920•9977 Cell: 818•370•2583 |
Redwood
Trunk Sewer Install
16 pits, design and fabricate whaler system, de-water, pour Concrete trim
seal. *Union
employees |
Crane Vibratory Hammer |
|
Design
Team: |
|
|
|
David McMahon |
Superintendant |
McMahon Construction McMahon Construction |